Future USS Doris Miller set for Dec. 5 keel-laying ceremony
The shipbuilder has set a December date for the next milestone for CVN-81. Here’s what keel laying means, how to watch and who Doris Miller was.
Newport News Shipbuilding has scheduled a Dec. 5 ceremonial keel laying for the future aircraft carrier Doris Miller, the Navy ship named for the sailor who earned the Navy Cross for his actions at Pearl Harbor. The ceremony in Newport News, Virginia, comes more than five years after the shipbuilder marked the carrier’s first cut of steel.
Shipbuilder HII’s event listing identifies the future ship by name and hull number, CVN-81. The December event is a milestone in construction. For readers following the carrier by name, the event also reconnects two stories separated by decades, the Navy’s decision to name the ship for an enlisted sailor and the actions that brought him national attention during World War II.
What the keel laying marks
The shipbuilder began with a ceremonial steel cut on Aug. 25, 2021, the first construction milestone it announced for the ship. The keel-laying ceremony comes later because fabrication begins before a modern carrier reaches that stage. HII said in 2021 that Newport News was already doing early manufacturing work, including fabricating the ship’s structure.
That distinction helps put the five-year span in context. The dates are about five years and three months apart. The first steel cut marked the start of the build and the keel laying marks a later stage. Delivery refers to the Navy taking possession of the ship. Commissioning is the formal entry into active naval service. The shipbuilder’s Dec. 5 listing announces the keel event, so it gives readers a construction date to follow.
HII’s December listing still uses Doris Miller, the name the Navy announced in January 2020. USNI News reported on Nov. 20 that the carrier would keep the name after earlier accounts that a change had been considered. The event listing establishes what the shipbuilder is calling the carrier at this milestone.
Who Doris Miller was
Doris Miller grew up in Waco, Texas, and was serving aboard the battleship West Virginia when Japan attacked Pearl Harbor on Dec. 7, 1941. According to the Naval History and Heritage Command, he helped move wounded sailors and manned an antiaircraft gun during the attack. Miller was a mess attendant at a time when Black sailors’ assignments were sharply limited. He had received no formal training on the gun, according to the Navy history.
Adm. Chester W. Nimitz presented Miller with the Navy Cross aboard the aircraft carrier Enterprise at Pearl Harbor on May 27, 1942. The Navy’s official ship history identifies him as the first African American sailor awarded that decoration. The photograph accompanying this story shows a different occasion. It was taken in January 1943, when Miller spoke at the Naval Training Station in Great Lakes, Illinois, wearing the medal.
Miller continued serving after the award. He was killed in November 1943 when the escort carrier Liscome Bay was sunk near Makin Atoll. The Navy later named a ship for him, Miller (DE-1091), which entered service in the 1970s. The new carrier is the second Navy ship to carry his name.
How to read the timeline
The Navy announced the carrier’s name on Martin Luther King Jr. Day in 2020. The Navy described it as the first aircraft carrier named for an African American and the first named in honor of a sailor for actions while serving in the enlisted ranks. The 2021 steel-cutting event marked the start of construction. The scheduled Dec. 5 ceremony is the next public date in that series.
Two ships called Enterprise appear in Miller’s story. The World War II carrier was the site of the 1942 award ceremony. The carrier the Navy is building today with that name, CVN-80, is a different vessel. Doris Miller is CVN-81. Using the hull numbers when looking up the schedule makes it easier to follow the right carrier and to distinguish current shipyard announcements from archival records.
How to watch the ceremony
HII says the event is closed to the public and plans to livestream it on the official event page. The livestream is the place to check for the start time and the shipbuilder’s account of what the ceremony marks. Future dates for the carrier should be checked against current Navy or shipbuilder announcements, since estimates issued at earlier construction milestones can change.
Trust & transparency
How we handled this story
Checked HII’s event and 2021 announcement, the 2020 Navy naming release, the Naval History and Heritage Command biography and the original photo record. Ceremony is closed to the public with a planned livestream.
Grounded in this reporting
Ask Newsmerica
Ask about this article. Answers quote the closest published passages and link back to their sources.
This tool retrieves article passages; it does not add outside facts.Keep exploring






